Hormuz risk reaches European contracts through price first

Our assessment is that tension at the Strait of Hormuz reaches businesses in Europe first through energy bills and through freight and insurance charges. That puts the legal work at the offer stage. Customs origin and tariff classification are separate checks that a change of route does not settle.

What the figures for 2024 and June 2025 show

The US Energy Information Administration (EIA) published its analysis of the strait on 16 June 2025. Oil flows averaged 20 million barrels per day in 2024, equivalent to about 20% of global petroleum liquids consumption. Around one-fifth of global trade in liquefied natural gas took the same route in 2024, primarily from Qatar.

At that date the EIA had not seen traffic through the strait blocked, yet Brent crude rose from $69 a barrel on 12 June 2025 to $74 the next day. The agency also estimated that 84% of the crude oil and condensate and 83% of the liquefied natural gas passing through the strait in 2024 went to Asian markets.

These figures are historical. They say nothing about transit, freight rates or insurance premiums on 27 November 2026. Our assessment rests on the mechanism they document: a benchmark price can move within a day, and buyers outside Asia, who received the smaller share of those cargoes, are reached mainly through that price.

How the cost reaches each party in the chain

The European Commission’s sixth report on energy prices and costs, published in February 2025, put the EU’s energy import bill at €427 billion for 2024, after a peak of €604 billion in 2022. Industrial gas and electricity prices were still 2 to 4 times higher than in the EU’s main trading partners. A price rise originating in the Gulf lands on a cost base that was already high at that date.

An importer sees the rise in landed cost and transit time once a carrier reroutes or quotes a surcharge. A manufacturer sees it in the energy bill, with a delay that depends on its supply contracts: the Commission found that in the recent energy crisis retail prices followed wholesale prices unevenly across EU countries, partly because of contract lengths and hedging.

An exporter carries the risk in a promised delivery date, a logistics provider in capacity sold at a fixed rate, and the buyer in a surcharge notice. A higher energy price is a cost event. Whether a specific input has become physically unavailable is a separate question of fact.

Contact us about surcharge clauses and offer validity

Route, origin and tariff classification as separate checks

A longer route or a different port of loading changes freight cost and timing. It does not by itself change customs origin. The European Commission’s customs guidance states that rules of origin determine where goods are considered to have been produced or manufactured, ‘not where they are shipped from’. Whether a diversion affects a particular preferential arrangement has to be checked against that arrangement and the proof of origin it requires.

Origin is one factor alongside tariff classification and customs value. For imports into the EU, the Commission’s Access2Markets portal directs traders to the tariff code first and then to the rate attached to it, and a Binding Tariff Information decision gives legal certainty about classification. An exporter shipping outside the EU checks the destination market’s own rules for the product and the date concerned.

New offers and existing contracts under German law

The decision pending now concerns quotations on the table. Before accepting, a buyer should have three points in writing: how long the offer binds, whether transport capacity on the quoted route is confirmed, and which documents will support any surcharge. A supplier issuing a quotation decides how long it can hold a price whose energy and freight components it does not control.

Where German law governs, surcharge wording is measured against sec. 1 of the German Price Clause Act (Preisklauselgesetz, PrKG). Under sec. 1(1) PrKG, the amount of a money debt may not be determined directly and automatically by the price or value of other goods or services that are not comparable with those agreed. An exemption in sec. 1(2) no. 3 PrKG covers clauses that tie the amount to the prices of goods or services in so far as these directly influence the creditor’s own costs of performance. A surcharge indexed to a crude oil benchmark should be drafted against that test and documented with the supplier’s actual cost share.

Existing contracts start from the risk allocation already agreed. Under sec. 313 of the German Civil Code (Bürgerliches Gesetzbuch, BGB), a party may demand adjustment where, among other conditions, the basis of the contract has changed seriously and adherence to the unchanged contract cannot reasonably be expected, having regard in particular to the contractual or statutory allocation of risk. The provision does not attach automatically to a rise in costs. Both provisions are German law; other legal systems have their own rules on price clauses and changed circumstances. Delivery promises that rely on alternative routes or substitute inputs should be checked for compatibility and documented before they are given; for substitute inputs, the record should show that they are technically compatible and have been approved by the customer.

Contact us about origin, classification and existing supply contracts